Engineering
The Division of Engineering oversees the design and construction of capital infrastructure projects, ensures new development is compliant with the community’s standards, and manages permitting within the public right-of-way.
Division of Engineering
101 E. Vine St.
4th Floor
Lexington, KY 40507
Visit Lexington's One-Stop Shop portal for help with permitting.
Manuals for New Development and Design and Construction can be found on their pages.
Paint markings on the street could be local utility companies marking their service lines. Below are the standard paint colors used by each utility.
News
Milling and paving work on South Limestone between Upper Street at Scott Street and Virginia Avenue, will begin Friday evening, July 23, and extend through Friday morning, July 30.
Traffic on Rosemont Garden at Clays Mill Road will be limited to allow only westbound traffic (away from Southland Drive) between 6 a.m. and 9 p.m. starting on Monday, July 19.
South Forbes Road will be shut down between Manchester St. and the railroad tracks beginning Monday, June 21.