Skip to page body Home About Community Living Doing Business Browse by Topic I Want to... Your Government
Tue, November 24 ,  ˚F  alt="icon of current weather" /> 

Updated November 23, 2015

Todds Rd Widening Project:

  • Thursday October 15 thru Tuesday December 22 from 7am to 6pm Monday thru Friday.
  • Single lane closures will be in effect with flaggers assisting traffic.
  • Intermittent delays are expected to be less than 15 minutes.

Closures Scheduled from 8am to 4pm:

  • W Second St between N Broadway and Jefferson St - Right lane blocked as needed for pavement repair.  Thru 11/27.

Closures Scheduled from 9am to 3pm:

  • Eastland Pkwy between Winchester Rd and Ft Sumter Dr - Rolling lane closures for milling and paving.  Thru 12/2.
  • Leestown Rd between Greendale Rd and Bracktown Rd - Outbound right lane blocked as needed for streetlight installation.  Thru 12/14.

Closures Scheduled 24 Hrs/Day:

  • Clays Mill Rd between Keithshire Way and Waco Rd - Lane closures as needed for roadway widening.  At least one lane open in each direction at all times.  NO LEFT TURNS from Clays Mill Rd onto either side of Wellington Way.  Thru 11/30/15.
  • N Upper St between W Short St and W Main St - Street CLOSED for the 21C Hotel project.  Traffic detoured to N Martin Luther King Blvd.  Thru 1/1/16.
  • Rose St between Columbia Ave and Huguelet Dr - Street CLOSED to thru traffic.  Local access for Funkhouser Dr.  Thru 8/1/16.
  • S Limestone between W Vine St and W Main St - Leftmost lane closed for CentrePointe projectUntil further notice.
  • W Vine St at S Limestone - Left turn lane to Limestone blocked for CentrePointe project.  Until further notice.
  • NOTE:  All parking and sidewalks around CentrePointe also closed for the CentrePointe project.  Until further notice.
Last updated: 11/23/2015 10:32:10 AM