Skip to page body Home About Community Living Doing Business Browse by Topic I Want to... Your Government
Tue, April 28 Fair,  37˚F  icon of current weather 

Updated April 27, 2015

Leestown Rd Widening Project:

  • Leestown Rd between Greendale Rd and Trade St is currently restricted to one lane in each direction.  Motorists should use added caution if traveling in this area and should expect delays, especially during rush hour traffic.
  • Lane closures will be in effect 24 hrs/day until further notice.

Scheduled Work for New Circle Rd Expansion Project:

  • Monday thru Friday from 9am to 2pm - Blasting performed on the outer loop between Old Frankfort Pike and Versailles Rd.  Traffic stopped for 15 minutes at a time.  Citizens may follow @NewCircleRd via Twitter for updates.

Closures Scheduled from 9am to 3pm:

  • Sir Barton Way between Carducci St and Starshoot Pkwy - Alternating lane closures for milling and paving.  Thru 4/29/15.
  • Oak Hill Dr between Carlisle Ave and Highland Park Dr - Southbound lane blocked for water main work.  Thru 4/30/15.

Closures Scheduled 24 Hrs/Day:

  • N Upper St between W Short St and W Main St - Street CLOSED for the 21C Hotel project.  Traffic detoured to N Martin Luther King Blvd.  Until further notice.
  • N Upper St between W Sixth St and W Fifth St - Right lane blocked as needed for water main installation.  Thru 4/30/15.
  • N Upper St between W Seventh St and W Sixth St - Right lane blocked for water main installation.  Thru 5/22/15.
  • Rose St between Columbia Ave and Huguelet Dr - Street CLOSED to thru traffic.  Local access for Funkhouser Dr.  Thru 9/1/15.
  • S Limestone between W Vine St and W Main St - Leftmost lane closed for CentrePointe projectUntil further notice.
  • W Vine St at S Limestone - Left turn lane to Limestone blocked for CentrePointe project.  Until further notice.
  • NOTE:  All parking and sidewalks around CentrePointe also closed for the CentrePointe project.  Until further notice.
Last updated: 4/27/2015 11:23:12 AM